Seismic Safety: Structural Engineering Reports for Campus Buildings

As per the UC Regents' policy, an effort is underway to assess and rate every single building on each of the ten University of California campuses.

The effort was launched in 2018 and relies on a phased approach and schedule, as specified by the Office of the President:

  • Phase 1: Completed no later than December 31, 2018 (completed)
  • Phase 2: Completed no later than June 30, 2019 (completed)
  • Phase 3: Completed no later than June 30, 2020 (underway)

Listed on this page are building reports conducted by structural engineering firms to assess buildings in Phase 1 and Phase 2.

Building Name: