Engineering Center

Status

Project Phase:
Construction

Anticipated Completion:
2025

Details

General Contractor:
XL Construction

Executive Design Professional:
SOM

Landscape Design:
PGAdesign

Project Location:
Campus Park (map)

Project Inquiries:
capitalstrategies@berkeley.edu
(510) 495-5786

Visit our Environmental Review page to access applicable California Environmental Quality Act (CEQA) notices and documents for UC Berkeley capital projects.

Construction Updates:

Summary of current and upcoming construction activities at the Engineering Center project site:

Please note that the construction schedule is subject to change and may be influenced by various factors, such as the weather.

Berkeley Engineering is committed to providing students with an enriching and transformative educational experience that fosters innovation, entrepreneurship, inclusion, and collaboration. The new Engineering Center will be unlike any other campus building, situated at the location of the existing Bechtel Engineering Center and overlooking Memorial Glade.

Encasing the Bechtel Center, the new building adds 35,500 square feet of space across two new floors. It will serve as a hub to support students' growth and passion for driving innovation and positive change. The center will offer convenient access to various programs that contribute to students' success, including academic advising, career services, tutoring, social events, and flagship entrepreneurship activities.

Designed with an open and light-filled layout, the center will provide students with a welcoming place to gather and collaborate, showcases the vibrancy of Berkeley Engineering. It will reinforce the inclusive, team-oriented culture of Berkeley Engineering.

One of the Engineering Center's key objectives is to promote cross-campus collaboration and inspire innovation and entrepreneurship. With four floors dedicated entirely to student space, it aims to foster an environment that encourages visionary ideas capable of transforming the world.

Funded entirely by philanthropy, construction of the new Engineering Center commenced in the summer of 2023 and is expected to be completed in 2025. Once finished, the center will play a crucial role in enhancing the Berkeley Engineering student experience.

Engineering Student Center - Online Open House - May 2022