Bid Results

Bid Results - Past 3 Months

Project Name: Number: Due: Results:

Zellerbach Hall CRP16 Egress Lighting – Re Bid

12712A

September 28, 2018

2:00pm PST

Preliminary Bid Results

Tang Center Flooring Repairs & Replacement

19410A

September 27, 2018

3:00pm PST

Preliminary Bid Results

Renovate Disabilities Studies Maker Lab – Mechanical - RE BID

17442A

September 27, 2018

2:30pm PST

Final Bid Results

Renovate Disabilities Studies Maker Lab –General - RE BID

17442A

September 27, 2018

2:00pm PST

Final Bid Results

RSF Weight Room Flooring Replacement

19428A

September 18, 2018

3:00pm PST

Preliminary Bid Results

RSF Locker Room Flooring Replacement

19430A

September 18, 2018

3:00pm PST

Preliminary Bid Results

Etcheverry 1174 Classroom Improvements

17376A

September 18, 2018

2:30pm PST

Final Bid Results

Zellerbach Hall CRP16 Egress Lighting

12712A

September 11, 2018

3:00pm PST

Final Bid Results

UC Botanical Garden Accessibility Improvements (Phase 3)

12683A

September 7, 2018

2:30pm PST

Preliminary Bid Results

DM Sproul Hall Elevator Replacement

17398A

August 31, 2018

2:00pm PST

Final Bid Results

Valley Life Sciences Building (VLSB) 4th Floor Office Renovation

17384A

August 7, 2018
2:00pm PST

Preliminary Bid Results

Davis Hall CRP18 Rooftop Louver Waterproofing - Re Bid

19682A

August 7, 2018
2:00pm PST

Final Bid Results

McCone Hall Rooms 119 & 155 Renovations

17432A

July 25, 2018  2:00pm PST

Final Bid Results

Giannini Hall - Seismic Safety Corrections

12051D

July 24, 2018  2:00pm PST

Preliminary Bid Results

Giannini Hall EML Relocation to Barker Hall

19413B

July 19, 2018  2:30pm PST

Preliminary Bid Results

CRP18 Duct Cleaning Program - Koshland Hall

19412A

July 19, 2018  2:00pm PST

Final Bid Results

Renovate Disabilities Studies Maker Lab - General

17442A

July 17, 2018  3:30pm PST

Final Bid Results

Renovate Disabilities Studies Maker Lab - Electrical

17442A

July 17, 2018  3:00pm PST

Preliminary Bid Results

Renovate Disabilities Studies Maker Lab - Mechanical

17442A

July 17, 2018  2:30pm PST

Final Bid Results

Davis Hall CRP18 Rooftop Louver Waterproofing

19682A

July 17, 2018  2:00pm PST

Final Bid Results

Etcheverry Hall CRP15 Sprinkler Sys Installation - Re-Bid

17180A

July 16, 2018  2:00pm PST

Final Bid Results

Li Ka Shing SEP-CRP14 HVAC (Exhaust Fan Optimization)

12435A

July 12, 2018  2:00pm PST

Final Bid Results

CRP18 Path and Road Renewal

17312A

June 26, 2018 2:00pm PST

Final Bid Results

Etcheverry Hall CRP15 Sprinkler Sys Installation

17180A

June 21, 2018 2:00pm PST

Final Bid Results

ShakeAlert Seismic Monitoring Installation

17399A

New Due Date:

June 12, 2018
2:00pm PST

Final Bid Results

Campus Life Safety Lighting

12667A

May 25, 2018
12:00pm PST

Final Bid Results

Dwinelle Hall Sanitary Sewer Replacement

19680A

May 23, 2018
2:00pm PST

Final Bid Results

Hill Area Substation to SS#1 15KV

C18105

May 17, 2018
2:00pm PST

Final Bid Results

RSSP Clark Kerr Campus Water Line

17644A

May 17, 2018
1:00pm PST

Final Bid Results

Bechtel Hall Library Flooring

C18224

May 10, 2018
2:00pm PST

Final Bid Results

Cheit Hall C318B Renovations - Lactation Room

17229A

May 8, 2018
2:00pm PST

Preliminary Bid Results

For bid results prior to the last three months, please contact Contract Administration.